Inframaxuae

Precision Trenchless Infrastructure Solutions

Over 89 Infrastructure Projects Successfully Delivered Across the UAE Specialists in Horizontal Directional Drilling (HDD) & Micro-Tunneling

Road Crossings • Highway Crossings • Marine Crossings • Railway Crossings • Utility Infrastructure

Inframax has successfully delivered trenchless pipeline installations across the UAE using Horizontal Directional Drilling (HDD) and micro-tunneling technologies. Our portfolio includes road crossings, water channel crossings, gas pipeline installations, and complex infrastructure projects executed for government authorities and private sector clients.
0 +
Million AED
TOTAL PROJECTS VALUE
0 +
Million AED Annual Project Capacity
FINANCIAL CAPABILITY
0 +
HDD & Infrastructure Projects
COMPLETED PROJECTS
0 +
Million AED
ONGOING PROJECTS VALUE
0 +
KM HDD Installations
PIPELINE INSTALLED
0 +
meter
LONGEST HDD CROSSING
0 "
inch
MAX PIPE DIAMETER
0 +
Years Industry Experience
YEARS OF EXPERIENCE

Our Projects

ADNOC Gas Pipeline Crossing – Sahil & Asab
Installation of 500mm CS Pipeline by HDD
Length: 2,700 LM
Client: ADNOC
Location: Abu Dhabi
Road E311 Infrastructure Crossing
Installation of HDPE Utility Lines by HDD
Length: 2,925 LM across 114 locations
Client: MCC / House Engineering
Location: Abu Dhabi
Saadiyat Island Water Channel Crossing
Installation of 9W / 200mm HDPE pipelines
Length: 432 LM
Client: ADM
Contractor: Hilalco
Ramhan Island Infrastructure Crossing
Installation of 225mm HDPE pipelines
Length: 737 LM
Client: ADM
EL SEWEDY POWER
Installation of 4W/200MM HDPE by HDD High Way Crossing 6 Nos Abu Dhabi / Al Ain Road
Length: 1,553 LM
Client: LITE
Location: Al Raha, Abu Dhabi
MERIT MARINE INTERNATIONAL
Installation of 4W/110MM HDPE by HDD Water Channel Crossing
Length: 2,831 LM
Client: ADNOC
Location: Fujairah – Kalba
HILALCO
Installation of 9W/200MM HDPE by HDD Water Channel Crossing
Length: 432 LM
Client: ADM
Location: Saadiyat Island
HILALCO
Installation of 4W/225MM HDPE by HDD Water Channel Crossing
Length: 737 LM
Client: ADM
Location: Ramhan Island
HILALCO
Installation of 4W/110MM HDPE by HDD Water Channel Crossing
Length: 200 LM
Client: ADM
Location: Ramhan Island
Abu Dhabi International Airport Road Crossing
HDD Installation of 6W/250mm HDPE Utility Lines
Length: 1,140 LM
Client: ADAC
Location: Abu Dhabi
Khalifa City Road Infrastructure Crossing
Installation of 300mm Steel Pipeline by HDD
Length: 880 LM
Client: ADM
Location: Khalifa City, Abu Dhabi
Al Maryah Island Road Crossing
HDD Installation of 200mm HDPE Utility Conduits
Length: 530 LM
Client: TDIC
Location: Abu Dhabi
Dubai Creek Water Channel Crossing
Installation of 300mm HDPE pipelines by HDD
Length: 1,200 LM
Client: DEWA
Location: Dubai
Khor Fakkan Channel Crossing
Installation of 6W/250mm HDPE by HDD
Length: 980 LM
Client: SEWA
Location: Sharjah
Al Maqta Channel Crossing
Installation of 400mm Steel Pipeline by HDD
Length: 560 LM
Client: ADM
Location: Abu Dhabi
Yas Island Water Crossing
Installation of 200mm HDPE Utility Lines
Length: 320 LM
Client: Aldar Properties
Location: Abu Dhabi
Reem Island Waterway Crossing
Installation of 8W/315mm HDPE by HDD
Length: 740 LM
Client: Sorouh
Location: Abu Dhabi
Khalid Lagoon Crossing
Installation of 4W/160mm HDPE Water Lines
Length: 415 LM
Client: SEWA
Location: Sharjah
Umm Al Quwain Creek Crossing
HDD Installation of 250mm HDPE Waterline
Length: 490 LM
Client: UAQ Municipality
Location: Umm Al Quwain
Ajman Corniche Channel Crossing
Installation of 4W/200mm HDPE by HDD
Length: 380 LM
Client: Ajman Municipality
Location: Ajman
Al Bateen Marina Crossing
HDD Pipeline Installation – Marina Infrastructure
Length: 275 LM
Client: ADM
Location: Abu Dhabi
Lulu Island Waterway Crossing
Installation of 350mm Steel Pipeline by HDD
Length: 640 LM
Client: ADDA
Location: Abu Dhabi
Deira Island Canal Crossing
HDD Installation of 6W/225mm HDPE Lines
Length: 720 LM
Client: Nakheel
Location: Dubai
Hamriyah Port Channel Crossing
Installation of 300mm HDPE Utility Lines
Length: 510 LM
Client: SEWA
Location: Sharjah
ADNOC Gas Transmission Pipeline
Installation of 600mm CS Gas Pipeline by HDD
Length: 3,400 LM
Client: ADNOC
Location: Ruwais, Abu Dhabi
Emirates Gas Pipeline Extension
Installation of 450mm Steel Pipeline
Length: 2,100 LM
Client: ENOC
Location: Dubai
Sharjah Gas Distribution Network
Installation of MDPE Gas Lines by HDD
Length: 1,850 LM
Client: SEWA
Location: Sharjah
Al Ain Gas Supply Pipeline
HDD Installation of 300mm Steel Gas Pipe
Length: 1,200 LM
Client: ADNOC Distribution
Location: Al Ain
Jebel Ali Gas Pipeline
Installation of 500mm CS Pipeline – Industrial Zone
Length: 2,600 LM
Client: DEWA
Location: Jebel Ali, Dubai
Musaffah Gas Network Upgrade
HDD Installation of 250mm HDPE Gas Lines
Length: 870 LM
Client: ADM
Location: Musaffah, Abu Dhabi
Takreer Refinery Gas Pipeline
HDD Installation of 400mm CS High Pressure Line
Length: 1,650 LM
Client: Takreer
Location: Ruwais, Abu Dhabi
RAK Gas Distribution Pipeline
HDPE Gas Line Installation by HDD
Length: 1,030 LM
Client: RAKIA
Location: Ras Al Khaimah
Fujairah Power Plant Gas Feed
HDD Installation of 350mm CS Gas Pipeline
Length: 920 LM
Client: FEWA
Location: Fujairah
Habshan Gas Compression Station
HDD Pipeline Tie-in – 500mm CS Main Line
Length: 2,200 LM
Client: ADNOC Gas
Location: Habshan, Abu Dhabi
Umm Al Nar Gas Loop Pipeline
Installation of 600mm CS Pipeline by HDD
Length: 1,780 LM
Client: ADNOC
Location: Abu Dhabi
Kalba Gas Supply Extension
HDD Installation of 200mm MDPE Gas Network
Length: 640 LM
Client: SEWA
Location: Kalba, Sharjah
Sheikh Zayed Road Utility Crossing
Multi-utility HDD Installation – Power & Telecom
Length: 450 LM across 18 locations
Client: RTA
Location: Dubai
Abu Dhabi Corniche Utility Duct
Installation of 200mm HDPE Conduit by HDD
Length: 620 LM
Client: ADDC
Location: Abu Dhabi
Etisalat Fiber Duct Crossing
HDD Installation of Telecom Ducts – 4W/110mm
Length: 1,100 LM
Client: Etisalat (e&)
Location: Dubai & Abu Dhabi
DEWA Power Cable Crossing
HDD Installation of 132kV Cable Conduits
Length: 380 LM
Client: DEWA
Location: Dubai
Du Telecom Duct Network
Installation of 6W/110mm HDPE Telecom Ducts
Length: 920 LM
Client: Du Telecom
Location: Sharjah
Masdar City Utility Corridors
HDD Multi-service Utility Installation
Length: 760 LM
Client: Masdar
Location: Abu Dhabi
Dubai Silicon Oasis Utility Crossing
HDD Installation of 4W/160mm HDPE Conduits
Length: 480 LM
Client: DSO Authority
Location: Dubai
ADNOC HQ Utility Tie-In
Multi-bore HDD Utility Crossing – Water & Power
Length: 310 LM
Client: ADNOC
Location: Abu Dhabi
RAK Media City Utility Network
Installation of 200mm HDPE Utility Lines by HDD
Length: 570 LM
Client: RAKEZ
Location: Ras Al Khaimah
Expo City Dubai Utility Crossing
HDD Installation of 8W/110mm HDPE Conduits
Length: 860 LM
Client: Expo Authority
Location: Dubai
Al Quoz Industrial Utility Duct
HDD Installation of 6W/200mm HDPE Lines
Length: 430 LM
Client: RTA
Location: Dubai
Zayed University Campus Utility
HDD Multi-utility Crossing – Telecom & Water
Length: 290 LM
Client: Zayed University
Location: Abu Dhabi
E11 Highway Crossing – Dubai–Abu Dhabi
HDD Installation of 500mm Water Main
Length: 1,800 LM
Client: ADWEA
Location: Abu Dhabi
E66 Al Ain – Dubai Highway Crossing
Installation of 8W/200mm HDPE by HDD
Length: 2,240 LM
Client: ADNOC
Location: Al Ain
Abu Dhabi Ring Road Crossing
Multi-bore HDD Pipeline Installation
Length: 960 LM
Client: ADM
Location: Abu Dhabi
Sharjah–Ajman Expressway Crossing
HDD Installation of 350mm CS Pipeline
Length: 1,050 LM
Client: SEWA
Location: Sharjah
Mohammed Bin Zayed Road Crossing
4W/225mm HDPE Utility Crossing by HDD
Length: 680 LM
Client: RTA
Location: Dubai
Fujairah Coastal Highway Crossing
Installation of 300mm Steel Pipeline by HDD
Length: 520 LM
Client: FEWA
Location: Fujairah
E311 Bypass Highway Crossing
HDD Installation of 6W/200mm HDPE Lines
Length: 1,350 LM
Client: MCC
Location: Sharjah
Hatta Road Highway Crossing
HDD Installation of 250mm CS Pipeline
Length: 790 LM
Client: Dubai Municipality
Location: Hatta, Dubai
Al Dhafra Highway Crossing
HDD Installation of 400mm HDPE Waterline
Length: 1,100 LM
Client: ADWEA
Location: Al Dhafra, Abu Dhabi
E75 Northern Emirates Highway
HDD Installation of 4W/250mm HDPE Utility Lines
Length: 1,480 LM
Client: MoPW
Location: Ras Al Khaimah
Dubai–Al Ain Expressway Crossing
HDD Installation of 500mm CS Pipeline
Length: 1,260 LM
Client: ADNOC
Location: Al Ain
Khor Fakkan Bypass Crossing
HDD Installation of 6W/200mm HDPE Gas Lines
Length: 670 LM
Client: SEWA
Location: Khor Fakkan, Sharjah

Our Gallery