S/NO | CONTRACT NO | CLIENT | MAIN CONTRACTOR | WORK DESCRIPTION | LOCATION |
1. | 01024257 | ALDAR | ASGC | INSTALLATION OF 1W/315MM HDPE BY HDD WATER CHANNEL CROSSING LENGTH 283LM |
AL GURM PHASE 2- AUH |
2. | MMIC/202 | GOVERNMENT OF SHJ | MERIT MARINE INTERNATIONAL | INSTALLATION OF 4W/110MM HDPE BY HDD WATER CHANNEL CROSSING LENGTH 283LM ROAD CROSSING LENGTH 113LM |
FUJAIRAH- KALBA |
3. | 5894 | HILALCO | FASTBORING | INSTALLATION OF 9W/200MM HDPE BY HDD WATER CHANNEL CROSSING LENGTH 432LM |
SAADIYAT ISLAND |
4. | M107/27 | ETISALAT | METRO CONTRACTING | INSTALLATION OF 4W/110MM HDPE BY HDD | BEACH PALA |
5. | BC-103K | EWA | COMSIP | INSTALLATION OF 4W/315MM HDPE BY HDD WATER CHANNEL CROSSING LENGTH 257LM ROAD CROSSING LENGTH 103LM |
SITRA- BAHRAIN |
6. | CH731-023 | ETIHAD RAIL | CCTC | INSTALLATION OF 4W/110MM HDPE BY HDD RAILWAY CROSSING LENGTH 177LM |
ZMC |
7. | PO1773 | ETISALAT | NETS INTERNATIONAL | INSTALLATION OF 4W/110MM HDPE BY HDD ROAD CROSSING LENGTH 147LM DIFFERENT LOCATIONS |
WADI MORAAB WESTERN REGION |
8. | INF30311 | CMW | KSPAN GENERAL CONT. | INSTALLATION OF 4W/200MM HDPE BY HDD ROAD CROSSING LENGTH 211LM DIFFERENT LOCATIONS |
AL BATAYEH |
9. | GD-1888-SIR-IRR | PRIVET SECTOR | GULF DUNES | INSTALLATION OF 1W/630MM + 1W315MM + 1W/160MM HDPE BY HDD ROAD CROSSING LENGTH 1,131LM DIFFERENT LOCATIONS |
SIR-BANIYAS ISLAND ONGOING |
10. | T1324TP | FIBREX | ALLMARINE | INSTALLATION OF 1W630MM+1W25MM HDPE BY HDD INTAKE & OUTFULL LENGTH 617LM |
HUDAYRIAT ISLAND |
11. | PO7315 | SEWA | KHABI CONTRACTING | INSTALLATION OF 2W/315MM HDPE BY HDD ROAD CROSSING LENGTH 153LM 2 LOCATIONS |
SHARJAH |
12. | KK-401 | ADP | TELAL CONTRACTING | INSTALLATION OF 1W/400MM HDPE BY HDD GRAVITY PIPE LINE LENGTH 33LM |
TAWEELA |
13. | SW0231 | CMW | TEMA CONTRACTING | INSTALLATION OF 1W/315MM HDPE BY HDD GRAVITY PIPE LINE LENGTH 17LM |
SWIHAN CAMP |
14. | 03312023 | GASCO | AL HANI | INSTALLATION OF 4W/110MM HDPE BY HDD UTILITY CROSSING LENGTH 77LM |
AL DHAFRA |
15. | RD-173 | DOT | TEMCO | INSTALLATION OF 2W/200MM HDPE BY HDD ROAD CROSSING LENGTH 91LM 1 LOCATION |
SHAHAMA |
16. | PO713624 | ARENA | GULF TUBE | INSTALLATION OF 4W/200MM HDPE BY HDD ROAD CROSSING LENGTH 27LM 1 LOCATION |
AL BAHIYA |
17. | NT-7415 | AL FUTAIM | KINAROAD | 17 NT-7415 AL FUTAIM KINAROAD INSTALLATION OF 2W/200MM + 2W125MM HDPE BY HDD ROAD CROSSING LENGTH 47LM 2 LOCATIONS AL BATEEN |
AL BATEEN |
18. | QNC-14257 | PRIVET SECTOR | NEXCON DEVELOPMENT. | INSTALLATION OF 4W/110MM HDPE BY HDD ROAD CROSSING LENGTH 217LM 3 LOCATIONS |
YAS ISLAND |
19. | N-6526 | MOID | TOP LINK CONTRACTING | INSTALLATION OF 2W/225MM HDPE BY HDD ROAD CROSSING LENGTH 192LM 1 LOCATIONS |
AIRPORT ROAD- RAK |
20. | 17311 | EMAL | XOLINE ELECTROMECHANICAL | INSTALLATION OF 4W/110MM HDPE BY HDD ROAD CROSSING LENGTH 93LM 1 LOCATIONS |